MODERNIZATION OF THE STREETS IN TIRGU- MURES
1. PROJECT’S PREZENTATION:
General objective:
Improving transport infrastructure in the
Specific objectives:
Modernization and road signs implementation of the streets that take over the traffic flow from the functional areas and lead them to:
Through this project, city streets will be modernized and signposted on a road length of
Rehabilitation and modernization of these roads will facilitate the traffic to other major cities in the country, namely Cluj Napoca,
- The proposed road section starts from
The area of this work is 21.855 sq.m. and its length is
Proposed works:
- modernization of the asphalt surface
- modernization of the sidewalks
- roadway ditches
- raising the utility manholes at the proper height
- mounting the road signs
- making the directional pavement markings
Deadline: December 2011
Actual stage: on going
Pictures
- The proposed road section starts from the intersection with
The area of this work is 25.750 sq.m. and its length is
Proposed works:
- modernization of the asphalt surface
- modernization of the sidewalks
- raising the utility manholes at the proper height
- concrete ditches
- mounting the road signs
- making the directional pavement markings
Deadline: December 2011
Actual stage: on going
Pictures
- The proposed road section starts from the intersection with the access to
The area of this work is 25.750 sq.m. and its length is
Proposed works:
- modernization of the asphalt surface
- modernization of the sidewalks
- roadway ditches
- raising the utility manholes at the proper height
- mounting the road signs
- making the directional pavement markings
Deadline: December 2011
Actual stage: on going
Pictures
Pictures
Pictures Livezeni Street- final:
- The proposed road section starts from the intersection with
The area of this work is 24.632 sq.m. and its length is
Proposed works:
- modernization of the asphalt surface
- sidewalks
- concrete ditches
- raising the utility manholes at the proper height
- mounting the road signs
- making the directional pavement markings
Deadline: December 2011
Actual stage: on going
Pictures
- The proposed road section starts from the intersection with
Proposed works:
- modernization of the asphalt surface
- sidewalks
- slab ditches
- raising the utility manholes at the proper height
- mounting the road signs
- making the directional pavement markings
- cycling tracks
Deadline: December 2011
Actual stage: on going
Pictures
- The proposed road section starts from the intersection with
The area of this work is 18.183 sq.m. and its length is
Proposed works:
- modernization of the asphalt surface
- sidewalks
- concrete ditches
- raising the utility manholes at the proper height
- mounting the road signs
- making the directional pavement markings
Deadline: December 2011
Actual stage: on going
Pictures
Pictures
- The proposed road section starts from the intersection with
The area of this work is 39.390 sq.m. and its length is
Proposed works:
- modernization of the asphalt surface
- sidewalks
- slab ditches
- raising the utility manholes at the proper height
- mounting the road signs
- making the directional pavement markings
- cycling tracks
Deadline: December 2011
Actual stage: finalized
Pictures
Pictures
Pictures Libertatii Street-final:
PROJECT’S VALUE:
The total value of the project is: 62.349.899,54 lei from which:
- Non-reimbursable financial assistance: 49.041.773,98 lei
- Co- financing: 1.009.294,68 lei
The difference of 12.387.469,73 lei is represented by the non-eligible costs and VAT that will be recovered through special procedures.
FINANCING SOURCE: REGIONAL OPERATIONAL PROGRAMME 2007 – 2013 PRIORITY AXIS 2 – Improvement of regional and local transport infrastructure, KEY AREA OF INTERVENTION 2.1 - Rehabilitation and modernization of the county roads and urban streets network- including construction/rehabilitation of ring roads
Management Authority for Regional Operational Programme: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM
ACCOMPLISHMENT DEADLINE: 2009-2011
IMPLEMENTATION RESPONSIBLE: PUBLIC AREA ADMINISTRATION AND TECHNICAL DIRECTION
Integrated Sustainable Development Program of the City of
1. PROJECT’S PRESENTATION:
General objective:
The objective of this key area of intervention is to increase the quality of life and to create new jobs in the city of
Specific objectives:
By implementing step I of this project a number of 20 municipal streets will be modernized and will be road signed, on a total length of
Modernization will ensure safety and comfort for both vehicular traffic and pedestrians, on the following street sections:
- A Vlahuţă -
- Tîrnavei -
- Secuilor Martiri –
- Constantin Romanu Vivu –
- Zăgazului - 204 m
- Crîngului - 64 m
- Dimitrie Cantemir –
- Subpădure –
- Muntenia –
- Grădinarilor –
- Suceava –
- Şurianu –
- Parângului –
- Rovinari –
- Salcîmilor –
- Gh.Doja –
- Podeni –
- Remetea Mică –
- Remetea Mare –
- Lăcrămioarei –
The project includes modernization implementation of the road system, sidewalks, longitudinal and transversal parking places, replacement of the utility manholes’ cover, replacing drains, providing pluvial water drainage, access to properties, longitudinal and transversal markings and road traffic signs.
2. PROJECT’S VALUE:
- The total value of the project is: 37.620.733,24 lei from which:
- Non-reimbursable financial assistance: 29.470.698,00 lei
- Co-financing 868.603,00 lei
The difference of 7.281.432,24 lei is represented by the VAT on the total value of the project.
3. FINANCING SOURCE: REGIONAL OPERATIONAL PROGRAMME 2007 – 2013 PRIORITY AXIS 1 - „Support to sustainable development of urban growth poles ”, KEY AREA OF INTERVENTION 1.1 – „Integrated urban development plans”
Management Authority for Regional Operational Programme: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM
4. ACCOMPLISHMENT DEADLINE: 2013
5. IMPLEMENTATION RESPONSIBLE: TECHNICAL DIRECTION
6. STAGE: