Please ensure Javascript is enabled for purposes of website accessibility

Proiecte Europene

buton proiecte europene

Proiecte PNRR

buton pnrr

POIM 2014 - 2020

buton poim

EU4Business

eu4business

Iaz Batal

banner iazbatal fazare

Protecția consumatorilor

InfoCons

Serviciul de urgență 112

112 logo

Ziua informării preventive

ziua inform preventive

fiipregatit.ro

fiipregatit.ro

Events calendar:

<<  March 2024  >>
 Mo  Tu  We  Th  Fr  Sa  Su 
      1  2  3
  4  5  6  7  8  910
11121314151617
18192021222324
25262728293031
Urmatoarele evenimente:

No current events.

Bilete online

buton teatrul national

Salvați copiii

salvati-copiii-logo

Autoritatea Națională Turism

banner aut nat.fw

SIS II

sis2 

Wikipedia:

wikipedia


 

1. PROJECT’S PRESENTATION:
General objective:
Improving the environment by creating green spaces in the city of Tirgu Mures.
Specific objectives:
Park rehabilitation in Carpaţi Alley;
Park rehabilitation in Haţeg Alley;
Park rehabilitation in Vrancea Alley

Results:
Carpaţi Alley no. 33-37
playground complex 3 towers, 2 slides, 1 swing
6 means of climbing and 2 means of climbing on cable                2 pieces
swing with two seats – 2/1,5 m                                                 2 pieces
rocking chair with four seats – 2/3 m                                         2 pieces
bench with three seats on metallic structure – 0,6/1,8 m            33 pieces
wooden bins on metallic structure                                            25 pieces
hexagonal wooden structure covered with wood-11,5/10m           1 piece
metallic lamp-posts with two arms-3,5m                                   15 pieces
wooden table on metallic structure- 1/1m                                   8 pieces
wooden pergola-4/1.3/2.5m                                                      3 pieces
sandbox-6.0/2.5m                                                                    1 piece
wooden gazebo- 4/4/2.5m                                                         4 pieces
The new space will be enclosed by decorative trees and on the lateral near the street will be planted a hedge along a length of 96 ml.

Vrancea Alley
- playground complex 3 towers, 2 slides, 1 swing
 8 means of climbing and 2 means of climbing on cable                
  4 access ramps for wheelchairs                                                1 piece
- swing with two seats -2/1,5m                                                   2 pieces
- rocking chair with four seats -2/3m                                           2 pieces
- bench with three seats on metallic structure -0,6/1,8m              20 pieces
- wooden bins on metallic structure                                            17 pieces
- metallic lamp-posts with two arms -3,5m                                   5 pieces
- sandbox -3,0/4,0m                                                                  1 piece
- wooden gazebo 4/4/2.5m                                                         3 pieces
- wooden pergola -4/1.3/2,5m                                                     3 pieces
- wooden table on metallic structure -1/1m                                   3 pieces 
The new space will be enclosed, according to the situation plan, by decorative trees, and the lateral near the street and the western  side will separate the space with a hedge.

Hateg Alley no.6-12
 - playground complex 3 towers, 2 slides, 1 swing
      6 means of climbing and 2 means of climbing on cable             1 piece
- swing with two seats -2/1,5m                                                     1 piece
- rocking chair with four seats -2/3m                                             1 piece
- bench with three seats on metallic structure -0,6/1,8m                 7 pieces
- wooden bins on metallic structure                                               6 pieces
- metallic lamp-posts with two arms -3,5m                                     3 pieces
- wooden table on metallic structure -1/1m                                    1 piece
- wooden pergola -4/1.3/2.5m                                                      2 pieces
- wooden gazebo -4/4/2.5m                                                         1 piece

2. PROJECT’S VALUE:
-         The total value of the project is:                 1.182.652 lei, from which:
-          Non-reimbursable financial assistance:       1.062.652 lei
-          Co- financing                                           120.000 lei 
3. FINANCING SOURCE: ENVIRONMET FUND ADMINISTRATION

4. DEADLINE: 12 months from the date of signing the financing contract
5. IMPLEMENTATION RESPONSIBLE: PROJECT IMPLEMENTED IN COLLABORATION WITH PUBLIC DOMAIN ADMINISTRATION
6. STAGE: signing the financing contract

 

Joomla Templates and Joomla Extensions by JoomlaVision.Com


Back

Alegeri2024

buton MOL

 

buton program transport local

buton program multianual sustinere familii

Grafic lunar colectare deseuri

buton spclep
buton weekend ro
seretirgumures
dastgmures ro
buton dfltgm
buton prog sitpf

Noutăți

BP
buton birou unic
buton parcare
buton prog acte identitate online
buton prog casatorii online2
buton prog transc online2
buton recomandari sezon estival
buton harta targu mures

Posturi vacante

buton posturi vacante

Projects. Strategies

BannerMyCity - EN3
banner_proiecte_en
Digital Mures
banner_oras_eco_en
banner_pug
banner_arh
 

Secțiune RUTI conform SNA

banner anticor.fw 

Social network:

FacebookTwitterYoutube

Vizitatori

Azi:1680
Ieri:1641
Săptămânal:6311
Lunar:35018
All5032445